Tavira Bridge over River Gilão

Description:
86.00 m length, with seven stonework arches
and 6.45 m width.
Main pathologies:
Disability to overcome flood events. Foundations infra excavation and masonry deterioration.
Main interventions:
Consolidation with micro foundations.

Strengthening the masonry structure of the bridge.

Reconstruction of the destroyed pier.

General rehabilitation and upgrading such as

grouting, replacement of blocks of stone, plaster

and paint. Deck surfacing.
Original Project:
Eng. Pedro de Santa Colomba (1655)
Property owner:
EP
Rehabilitation Project:
A2P
Rehabilitation:
TEIXEIRA DUARTE
End of works:
1993